Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
  • Lora has requested that our meetings do NOT get recorded.  She has specifically said that the team does NOT have permission to record any meeting that she attends.
  • Joel has not done a lot of work for this sprint yet.
  • Joel is working on shrinking the logo in the navbar
    • Trying to do it programmatically rather than having a smaller logo file (but keep the log file small)
    • Also need to decide what to do for smaller mobile screens (and tablets although not as much an issue there)
  • Question on if we want the carousel below the navbar
  • TWS-33:
    • Lora's work is done
    • Joel now needs to incorporate this into the main page
    • PROBLEM: may need to have the calendar itself on a separate page so it can be updated easily weekly
  • TWS-43 - needs to be worked on, assigned to Mary to do the MVP website testing on phone and tablet
  • TWS-39 - done
  • TWS-41 - This may be eliminated by the post-MVP website redesign
  • TWS-42 - This may be eliminated by the post-MVP website redesign
    • For Sprint 2 MVP site fix:
      • Move logo into navbar at a small size
      • Move carousel into the General Meeting section
  • TWS-37 - done
  • TWS-47 - Move the schedule icon to replace the "Action Library except 4th Wednesday in Chelmsford Library" part of that line
    • add Check Schedule label to icon
  • Frank found a solution to the navbar items wrapping, put "&nsp;" between navbar items and they won't wrap