  • Lora updated TSSG.Tech to remove the graphics and do simple about information for each team in a basic HTML page.  This is the temporary MVP website.
  • Stand-up:
    • Wayne will be out first week of May, Jim will do Scrum Master role that week
    • Joel completed the initial log edit.  Has determined that we need to have wireframes wire frames of what we want the new website to look like before he makes further changes.
    • Jim reviewed the Confluence changes made over the week
    • Paul looking at moving Musician's Manager project into Docker.  Will need help from Ralph
    • Ralph looking into RethinkDB, like MongoDB but scales better
  • First topic:  review of the MVP page discussion from 4/22
    • Current TSSG.Tech is a basic HTML page with links to small pages for what each team is working on
    • Testimonials page is a place holder, to be fleshed out with more information.
      • Decision is to not have any names on this page.
      • Needs to have a name for it to be looked as valid.  Both first name and last name needed
      • Call this something other than Testimonials
      • Ask customer on Wednesday if we should have this page on the MVP site for now
    • We want to do four 2-week sprints so we can get this project completed
    • Need to work on the wording of "in-transition and enthusiasts" some more
  • Road map page
    • Sprint 1 is NOT what Lora just published as TSSG.Tech.   This is for the first major revision of the page
    • What are people looking for when they say "responsive design"?  Is it just scalability on different devices?
    • We need wire frames for how the site should look before we start on each of the sprint's work on the website
      • What should it look like that we are trying to build for that sprint?
    • Reminder: phone screen is the PRIORITY if we need to determine how something looks (both horizontal and vertical)
      • Tablet is second priority, then desktop/laptop
    • We had previously decided to start with Donna's proof of concept, update the team project content, and put that out to the public as the temporary website
    • Lora wants team to start from scratch.  Other team members disagree with that
    • It is a MANUAL process to update the working website on Technology Nursery, can not display it automatically by just checking in the cod to GIT
    • What are we putting out on tssg.tech for the public while we work on the sprints?
    • We will use TechnologyNursery.com/TSSGTechStaging as the in-progress website for our sprint work
      • Better name is InProgress or Dev since we are not going from Staging to Production until the end of the project
      • Joel and Ralph to determine what the folder name and link will be for this
    • Jira ticket TWS-13 created to get the MVP website on tssg.tech during sprint 1
    • Page created for the Design Guidelines