- Lora and Joel are NOT receiving emails from TSSG-Web. Invites to the group resent to fix this absence.
- Jira issue TWS-13 is being used as Epic for Create MVP release
- Current target is May 21, 2018
- There are issues added for parts of MVP that need to be done
- Lora is moving off from Web team as of May 21, so that has to be our target date for sprint 1
- No replacement product owner has been lined up yet
- Not all of the work needed for MVP has been captured yet in a Jira ticket
- Team Page content is captured in Confluence
- Joel's wireframes are what the team will be using for the MVP release
- Three wireframes: main page, General Meeting section, generic section for each team
- Wireframes have been exported from Google Draw Doc where they are currently stored into PDF/PNG files and added into Confluence
- Team decision: for MVP, single page where the General Meeting section at the top, then a section for each team.
- Links in navigation bar take you to the part of the page for that team
- Header and navigation bar remains at top of page as content is scrolled down.
- Can jump to any section from link in navigation bar
- Nice to have: the button for the section you are in is highlighted
- For story point estimates, using range of 1 - 10 (5 is medium size story)
- We will be estimating EFFORT needed to complete the story, not complexity of the story
- The sprint has been started
{"serverDuration": 46, "requestCorrelationId": "b80a02ffc69e7028"}