You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Current »

Date

(created by Joel Sharasheff)

Attendees

Goals

  • Setting our new TSSG web site design and sprint plans.

Discussion items

TimeItemWhoNotes
3 hours!web sprints; web links; meeting timeAll
  • What minimal acceptance criteria do the TSSG groups want in the new web site?
  • Created an initial story in Confluence of a Minimal Viable Product.
  • We want to replace the existing web site as soon as we can since it does not display well on a phone, etc.
  • new POC - A new graphic needs to be added to the top left navbar.
  • new POC - remove footnote section and everything below main text for now.
  • new POC - remove scheduling graphic and 6-column limit on text.
  • What is a reasonable start and end time for the Monday Web meetings? Expected length was 1.5 hours.
  • Put links to the existing and new web sites in the shared links section.
    

Action items

  • Retrieve a minimum set of characteristics that are acceptable for our new TSSG web site. These will be presented to the group at the next general meeting for feedback on web site requirement requests from all groups. The goal is to get direction on changes in order to replace the existing TSSG web site as soon as possible. [all]  
  • Clean up of new web site (see discussion items above).  [Joel Sharasheff ASAP]
  • Create shared links for web sites (current and new) in Confluence. [Joel Sharasheff ASAP] 
  • No labels