Date
Attendees
- Jim Drewniak
- Shawn Flynn
- Tyler Putnam
- Alan Rawsthorne
- Jess, Andy, Norm, and Bob
Discussion items
Joel received the ok for the devops changes to Production for the tssg.tech web site; along with weekly schedule update for Wednesday night. DONE!
The Web group looked on Jira to figure out what changes need to be done to the current sprint 3.
The Web group is trying to prepare for a design spike.
TWS-29 and 12 go back on the backlog
TWS-32 and 49 will be joined as a ticket from sprint 3 to a design spike.
Dragged all 4 of the above stories off of sprint 3 and into the backlog. Will continue with this at the Monday Web meeting.
A reminder from Jess that there is a Dice job fair at the Newton Marriott on Friday starting at 11am.
Joel is away from Saturday to Saturday but will check his mail.
The meeting ended early.
Action items