- MVP page moved to be under Brainstorming
- Lora updated TSSG.Tech to remove the graphics and do simple about information for each team in a basic HTML page. This is the temporary MVP website.
- Stand-up:
- Wayne will be out first week of May, Jim will do Scrum Master role that week
- Joel completed the initial log edit. Has determined that we need to have wire frames of what we want the new website to look like before he makes further changes.
- Jim reviewed the Confluence changes made over the week
- Paul looking at moving Musician's Manager project into Docker. Will need help from Ralph
- Ralph looking into RethinkDB, like MongoDB but scales better
- First topic: review of the MVP page discussion from 4/22
- Current TSSG.Tech is a basic HTML page with links to small pages for what each team is working on
- Testimonials page is a place holder, to be fleshed out with more information.
- Decision is to not have any names on this page.
- Needs to have a name for it to be looked as valid. Both first name and last name needed
- Call this something other than Testimonials
- Ask customer on Wednesday if we should have this page on the MVP site for now
- We want to do four 2-week sprints so we can get this project completed
- Need to work on the wording of "in-transition and enthusiasts" some more
- Road map page
- Sprint 1 is NOT what Lora just published as TSSG.Tech. This is for the first major revision of the page
- What are people looking for when they say "responsive design"? Is it just scalability on different devices?
- We need wire frames for how the site should look before we start on each of the sprint's work on the website
- What should it look like that we are trying to build for that sprint?
- Reminder: phone screen is the PRIORITY if we need to determine how something looks (both horizontal and vertical)
- Tablet is second priority, then desktop/laptop
- We had previously decided to start with Donna's proof of concept, update the team project content, and put that out to the public as the temporary website
- Lora wants team to start from scratch. Other team members disagree with that
- It is a MANUAL process to update the working website on Technology Nursery, can not display it automatically by just checking in the cod to GIT
- What are we putting out on tssg.tech for the public while we work on the sprints?
- We will use TechnologyNursery.com/TSSGTechStaging as the in-progress website for our sprint work
- Better name is InProgress or Dev since we are not going from Staging to Production until the end of the project
- Joel and Ralph to determine what the folder name and link will be for this
- Jira ticket TWS-13 created to get the MVP website on tssg.tech during sprint 1
- Page created for the Design Guidelines
{"serverDuration": 55, "requestCorrelationId": "dbe2dca5c9b1dfc8"}